Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jan 06, 2021     34-3 Baggage door step 1-4 - (3 hours) Category: Fuselage
Positioned the baggage door external skin in the baggage door opening. Marked according to instruction the skin and the fuselage as preparation for the installation of the hinge.
Cut an AN257-P3 hinge length to measure and drilled the #40 rivet holes at 1"1/8 distance from each other starting 1/4 inch from both hinge ends.
Positioned the hinge on the frame within the two marks in step 1. Matchdrilled #40 into through the hinge into the frame.
Slightly trimmed the skin.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.